Issue 63

Formal title: Improved reporting of event history and profile availability during outage events on the BMRS REMIT pages

Current Status

Submission
Assessment
Closed

Issue 63 will look at the way Regulation on Energy Market Integrity and Transparency (REMIT) information is submitted and published on the Balancing Mechanism Reporting Service (BMRS) where a reported outage consists of multiple availability levels during the course of the event. The Proposer believes that the current method of reporting a single minimum availability for the entire outage period doesn’t give a complete representation of changes in availability during the event.

Progression

Issue 63 was raised by RWE Supply and Trading on 10 December 2015. Ultimately Issue 63 was withdrawn as the solution was adopted in to the p329 Proposed and Alternative Modifications.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or